
HB 264 Project
Energy Optimizers, USA has designed the Bethel District project to include a building automation control system to utilize advanced energy conservation programs to control the heating, cooling and ventilation systems.
Lighting upgrades will significantly reduce the electrical load and improve the energy efficiency and quality of light in the facility.
Solar powered automatic restroom sinks and a solar thermal domestic hot water system will be installed, saving energy and water while serving as an educational tool for the students and community. New HVAC systems will be installed in the High School, Junior High, and 1969 Elementary wings.
Superintendent Jeff Cassell explains that, “while the project cost is $633,290, it will reduce utility, operating and maintenance costs annually by at least $58,465.”
